Work Program for 2017 -18
New tee box signs have now been installed, many of which have been sponsored by local businesses still some available.
–
The green staff are in the process of renewing the 15th green
- Also a drainage pipe has been installed from behind the right hand bunker on the second green back down the fairway connecting into the drain from the third to the sixteenth, this is in preparation when we rebuild the second green, also to drain the area when flooding occurs.
- The base of the pond on fourth has also been cleaned out .